RGS Cleaning Ltd — Risk Assessments Download spreadsheet
Risk Assessment RA 5

Floor cleaning/polishing using an upright machine

AssessmentRA 5
Date of assessment / review01/04/2026
Area / locationNationwide
Review period12months or 1st April whichever is sooner

Persons exposed

Employees Contractors Visitors / public

Type of assessment

Initial Change / incident review

Hazards and control measures

1

Hazard

Hazard(s)

• Chemicals - Poor storage of and exposure to hazardous substances.

Control measure(s)

• COSHH assessments communicated - COSSH assessments have been communicated to relevant employees.
• Employees trained in COSHH procedures - Employees have been trained in how to use the chemicals and the safe system of work.
• First aid procedures in place.
• Induction Training.
• PPE provided.
• Provisions of Written Policy.

Who will completeNot specified
By whenNot specified
Date completedOn-going
2

Hazard

Hazard(s)

• Electrical Faults Leading to fire or electric shock.

Control measure(s)

• Avoid Trailing Cables.
• Damage must be reported immediately.
• Electrical Safety Check Undertaken.
• Electrical systems regularly maintained and inspected by competent person.
• First Aid Procedures.
• Regular PAT testing. All electrical appliances to be Portable Appliance Tested (PAT) at regular and appropriate intervals.
• Routine Maintenance Undertaken.
• Training in the use of the equipment.

Who will completeNot specified
By whenNot specified
Date completedOn-going
3

Hazard

Hazard(s)

• Manual handling Tall, awkward & unwieldy loads that are difficult to lift, transport and handle.

Control measure(s)

• A Manual Handling Assessment has been carried out.
• Avoid any unnecessary lifting and Handling.
• Induction Training.
• Manual handling training. All staff are trained in Manual Handling and instructed to comply with good manual handling techniques.
• New and expectant mother risk assessment. New and expectant risk assessments are conducted to review individual requirements with regards to manual handling abilities.
• Provisions of Written Policy.
• Staff get help. Staff instructed to seek assistance if they consider an item is too large or too heavy to manage on their own.

Who will completeNot specified
By whenNot specified
Date completedOn-going
4

Hazard

Hazard(s)

• Manual handling Tall, awkward & unwieldy loads that are difficult to lift, transport and handle.
• Moving parts of machinery Danger of bodily Injury through contact with ungaurded instruments.

Control measure(s)

• All safety devices - interlocks, light guards and micro switches fully operational and checked regularly.
• Avoid Loose Clothing.
• Barriers in Use.
• First Aid Procedures.
• Only competent persons are permitted to carryout the task.
• Routine Maintenance Undertaken.
• Routine Safety Checks Undertaken.
• Training in the use of the equipment

Who will completeNot specified
By whenNot specified
Date completedOn-going
5

Hazard

Hazard(s)

• Noise Danger of exposure to excessive levels of noise.

Control measure(s)

• Hearing Protection Should be Considered Being Worn.
• Noise control procedures in place. Correct equipment maintenance in place to ensure noise level as per manufacturers type approval limits (exhaust baffles, etc. fitted and checked before use). PPE (ear protection) to be worn. Hazard signage to be displayed.
• Training in the use of the equipment.

Who will completeNot specified
By whenNot specified
Date completedOn-going
6

Hazard

Hazard(s)

• Slippery Floors Slips, trips and falls could occur if appropriate signage is not in place to advise floor has been cleaned.

Control measure(s)

• Adequate lighting provided.
• Barriers in Use.
• First Aid Procedures
• Good Staff Communications
• Induction Training.
• Warning Signs Displayed.

Who will completeNot specified
By whenNot specified
Date completedOn-going