RGS Cleaning Ltd — Risk Assessments Download spreadsheet
Risk Assessment RA 14

Property Clearance

AssessmentRA 14
Date of assessment / review01/04/2026
Area / locationNationwide
Review period12months or 1st April whichever is sooner

Persons exposed

Employees Contractors Visitors / public

Type of assessment

Initial Change / incident review

Hazards and control measures

1

Hazard

Hazard(s)

• Adverse Weather
• Operatives can suffer mild reddening of the skin from sun burn when transporting items to and from site, they could also become dehydrated due to the heat and lack of fluids. Discomfort can also be suffered from wet and windy conditions

Control measure(s)

• Cease activity in adverse weather Work activities to be cancelled by the team leader during extreme weather conditions e.g. high winds and snow.
• Drinking water provided Team leader to ensure there is an adequate supply of bottled water onsite to prevent operators suffering dehydration.
• Wear suitable clothing Wear or have suitable clothing available in the event of changing weather. All operatives to receive information on induction of the need to wear sensible clothing and sun protection

Who will completeNot specified
By whenNot specified
Date completedOn-going
2

Hazard

Hazard(s)

• Asbestos Dust
• Operatives are at risk of developing mesothelioma, other asbestos related cancers, scarring of the lung tissue and pleural plaques from inhaling dangerous asbestos fibres disturbed when carrying out work activities.

Control measure(s)

• Asbestos awareness training All operatives are provided with asbestos awareness training to recognise Asbestos Containing Materials (ACMs)
• Asbestos register checked prior to work commencing Employer must check the asbestos register prior to any work commencing, confirming its location and condition.
• Asbestos survey Asbestos survey carried out, if it is suspected that asbestos is present.
• Suspected asbestos reported Staff have been informed and instructed with regards to action to be taken if asbestos is suspected. Staff are informed to STOP work where asbestos may be present and report immediately to site supervisor

Who will completeNot specified
By whenNot specified
Date completedOn-going
3

Hazard

Hazard(s)

• Assault
• Operatives could suffer verbal and physical abuse from trespassers and squatters.

Control measure(s)

• Procedure for acts of violence in place Staff instructed to activate the call alarm at the first sign of violence and immediately withdraw from the scene When withdrawal is not possible, staff are to shout or scream and give positive commands as 'call the police' if applicable or get help Staff to be given instruction and training on when it is appropriate and how to intervene Physical force is to be avoided at all costs unless the assailant actually assaults the person and there is no other option Staff to be trained in deescalation skills Staff to be trained in control and restraint techniques Minimum staffing numbers to be adhered to
• Staff training in response to violent incidents. Staff instructed to try to get away as quickly as possible, move towards a place where there are people around Carry a personal alarm - set it off as near to the attackers ear as possible, then throw it in the OPPOSITE direction to where you will be running Shout and make noise, something practical such as “call the police" usually get a better response than “Help" If possible, seek to attend “break-away training" from a qualified instructor, to give you skills to help you in the event of being grabbed by someone

Who will completeNot specified
By whenNot specified
Date completedOn-going
4

Hazard

Hazard(s)

• Electrical Faults
• Electric shock from exposure to faulty electrics in the premises such as damage switches and sabotage. Operators can suffer Cardiac arrest due to the electrical effect on the heart. Muscle, nerve, and tissue destruction from a current passing through the body. Thermal burns from contact with the electrical source.

Control measure(s)

• All staff aware of electric shock potential associated with property clearances.
• Appropriate first Aid kit available
• Electrical Supply Isolated Electrical Supply Isolated and locked off where possible.
• Inspection of fixed electrics A copy of the a fixed installation electrical report should be obtained from the customer prior to work commencing.

Who will completeNot specified
By whenNot specified
Date completedOn-going
5

Hazard

Hazard(s)

• Fire
• Operators can suffer serious and fatal injuries from smoke inhalation and burn injuries from the flames.

Control measure(s)

• Adequate Fire safety equipment to be provided
• All persons aware of fire procedures
• Appropriate Fire Fighting Equipment training is provided.
• Fire evacuation training carried out

Who will completeNot specified
By whenNot specified
Date completedOn-going
6

Hazard

Hazard(s)

• Legionella
• Operators can contract Legionnaires’ disease by inhaling small droplets of water (aerosols), suspended in the air, containing the bacteria. Symptoms can be similar to that of the flu.

Control measure(s)

• Dust Mask should consider being worn. Operators must use 3M dust mask conforming to EN149:2001 FFP3
• Services plans available from customer Before work starts, service plans must be checked with the customer to ascertain the presence and locations of water tanks, dead legs and redundant pipework. Systems should be thoroughly flushed through before work commences.

Who will completeNot specified
By whenNot specified
Date completedOn-going
7

Hazard

Hazard(s)

• Lone working
• Lone workers are those who work by themselves without close or direct supervision. Danger of accident or injury. Injuries may become worse if the operative is unable to obtain medical assistance

Control measure(s)

• Appropriate first Aid kit available Lone workers to carry first aid equipment.
• Lone workers contactable by mobile phone Lone workers to carry mobile phones and report in to the site supervisor at regular pre-determined intervals.
• Lone working risk assessment carried out An assessment of the risk to lone workers, specifically pregnant workers carried out and control implemented. This may include- changing of shifts to remove lone working, regular checking of the lone workers, patrols, phone checks and the use of panic alarms for emergency responses.
• Team Work System Operated Team Work System Operated. Operatives to work in teams where practical.

Who will completeNot specified
By whenNot specified
Date completedOn-going
8

Hazard

Hazard(s)

Lifting and moving of heavy items

Control measure(s)

• Manual handling
• Operators can suffer musculoskeletal injuries such as sprains and strains from handling rubbish and loading and unloading vehicles.

Additional controls required

• A Manual Handling Assessment has been carried out
• Individuals have received information, instruction and training in manual handling techniques
• Lifting aids used Mechanical lifting aids are used, if they are required following a site assessment by the site supervisor.
• Manual Handling training completed on Atlas
• Team Work System Operated Team Work System Operate. Heavy awkward items must be moved by two or more people

Who will completeNot specified
By whenNot specified
Date completedOn-going
9

Hazard

Hazard(s)

• Plants and insects
• Operatives may suffer impact injuries from branches causing eye and minor head injuries. Splinters from thorny plants such as Euphorbia milii 'Vulcanus Red' succulent house plant and allergic reaction from plants and insect bites and stings.

Control measure(s)

• Adequate PPE provided and used Suitable PPE provided to include goggles and hard hats to protect against impact injuries from branches. Suitable protective clothing and gloves must be worn when removing dangerous plants.
• Bins and waste containers to be covered. Only bins and waste containers with lids are to be used, helping to prevent insects and wasps being attracted to the area.
• Emergency plan inc first aid and medical assistance are available Site supervisor must be aware of any known allergies that operators suffer from and what the emergency procedures are.

Who will completeNot specified
By whenNot specified
Date completedOn-going
10

Hazard

Hazard(s)

• Slips & Trips
• Operators can suffer cut, bruises, sprains, strains, head injuries and other serious injuries from slippery, uneven surfaces, damaged or loose carpets and floor coverings especially on stairs. Poor housekeeping can also be a contributory factor.

Control measure(s)

Not specified

Who will completeNot specified
By whenNot specified
Date completedOn-going
11

Hazard

Hazard(s)

• Unsafe structure
• Operators can suffer serious and fatal injuries from the collapse of ceilings, walls and floors when carry out work activities.

Control measure(s)

• Restrict operator access to structures Workers are not to enter the site if it has been deemed unsafe. Work will not recommence until a structural engineers report has been obtained.
• Site condition report A site condition report must be obtained from the customer prior to commencing any work.
• Supervisor to be informed Operatives to cease work immediately if parts of the structure are found to be unsafe and report it to the site supervisor.

Who will completeNot specified
By whenNot specified
Date completedOn-going
12

Hazard

Hazard(s)

• Vehicle Movement
• Operators could suffer impact or crushing injuries from vehicle movements when loading and unloading waste or materials.

Control measure(s)

• Clear communication channels Clear communication channels between any drivers and operatives when they are removing sharps from the property. Hi Visibility Clothing Must be Worn
• Hi Visibility Clothing Must be Worn be operatives at all times.
• Toolbox Talks Toolbox Talks to provide operatives with information and guidance when working close to unguarded roads or areas with a high flow of traffic. Validation should be gained from the operative with a series of questions on completion.

Who will completeNot specified
By whenNot specified
Date completedOn-going
13

Hazard

Hazard(s)

• Waterborne Diseases, Infections and blood borne viruses
• Infection and viruses can be caused through operatives coming into contact with bodily fluids from hypodermic syringes left onsite and rodent and animal urine and faeces. Infections can include HIV, hepatitis b and c and leptospirosis

Control measure(s)

• Adequate PPE provided and must be used. Suitable PPE provided and to be used at all times by operators when onsite.
• Appropriate Immunisation Provided where necessary All operatives to receive Hepatitis b and c immunisation and be checked regularly to ensure they are up to date.
• Inspect the site prior to set up The site must be inspected prior to set up and a report obtained from the customer that should highlight any hazards present onsite. All information to be communicated to the operatives.
• Training in the safe removal of sharps All operatives to receive training on the safe removal of sharps.

Who will completeNot specified
By whenNot specified
Date completedOn-going
14

Hazard

Hazard(s)

• Working at height – Ladders
• Activity may constitute working at height. Suitable safety procedure and controls may not be considered. Ladders may be defective, poorly maintained or not checked before use. Operators may suffer cuts, bruises, broken bones and other serious injuries

Control measure(s)

• Areas Isolated When Ladders In Use Areas Isolated When Ladders In Use
• Employees are trained in the use of ladders
• Ladders are inspected before use Ensure they are fit to use
• Ladders used for short duration work only