Introduction

The purpose of this method statement is to establish a systematic approach to property clearance. The aim is to ensure that all tasks are conducted safely, efficiently, and in an environmentally responsible manner. The document outlines the steps to clear a property of all items, waste, and debris, while mitigating risks to personnel and the environment.
2

Scope of work

This method statement applies to all property clearance activities, including residential, commercial, and industrial properties. It covers the removal of furniture, fixtures, fittings, hazardous materials, and general waste, ensuring that the property is left in a clean and safe condition.
3

Responsibilities

Project Manager: Oversee the entire clearance operation, ensure compliance with this method statement, and manage the coordination of all team members. Site Supervisor: Supervise on-site activities, ensure that the team follows procedures, and handle any issues that arise during the clearance. Clearance Team: Perform the physical clearance of the property, including packing, removal, and disposal of items. Health and Safety Officer: Ensure all safety protocols are followed and conduct risk assessments as needed. Environmental Officer: Monitor environmental practices, ensuring that waste disposal and recycling are carried out correctly.
4

Equipment and materials

Personal Protective Equipment (PPE): Gloves, safety boots, high-visibility vests, helmets, and masks (if required). Hand Tools: Screwdrivers, hammers, pliers, crowbars, etc., for dismantling fixtures. Power Tools: Drills, saws, and other tools as necessary for removing built-in fittings. Waste Disposal Bags: Heavy-duty bags for collecting and disposing of waste. Vehicles: Trucks or vans for transporting items to disposal or recycling facilities. Cleaning Supplies: Brooms, mops, dustpans, and cleaning agents for final cleanup. First Aid Kit: For addressing any minor injuries on site. Hazardous Material Containers: If needed, for safe disposal of hazardous waste.
5

Procedure

Pre-Clearance Preparation: Conduct a site survey to identify all items to be cleared and assess any potential hazards. Develop a clearance plan, including the identification of valuable or hazardous items. Secure any necessary permits for disposal of certain materials (e.g., asbestos). Site Setup: Set up safety barriers or signs around the property to prevent unauthorized access. Ensure all team members are equipped with appropriate PPE. Clearance Process: Begin with the removal of large furniture and fixtures, disassembling where necessary. Sort items into categories: reusable, recyclable, hazardous, and general waste. Safely remove and contain any hazardous materials following legal guidelines. Load items onto vehicles for transportation to the appropriate disposal or recycling facilities. Conduct a final sweep of the property to ensure all items have been removed. Post-Clearance: Clean the property thoroughly, ensuring no debris or waste is left behind. Inspect the property to confirm that all clearance tasks have been completed to the required standard. Remove all safety barriers and signs after the property has been cleared and cleaned.
6

Safety precautions

Conduct a risk assessment before beginning clearance to identify potential hazards. Ensure all team members wear the appropriate PPE at all times. Use proper lifting techniques to prevent injury when moving heavy objects. Ensure that all tools and equipment are in good working condition and used safely. Be cautious of sharp objects, unstable structures, or hazardous materials. Use appropriate handling and disposal methods for hazardous materials.
7

Emergency procedures

Injury: Provide immediate first aid and call emergency services if necessary. Report the incident to the Health and Safety Officer. Fire: Evacuate the property immediately and contact the fire department. Ensure all team members are accounted for. Hazardous Material Spill: Contain the spill if safe to do so, using appropriate spill kits, and notify the Health and Safety Officer.
8

Environmental considerations

Prioritize the reuse or recycling of materials wherever possible to reduce waste. Dispose of hazardous materials in compliance with local environmental regulations. Minimize noise and dust during clearance activities to reduce the impact on the surrounding environment. Ensure vehicles used for transport comply with emissions standards.
9

Training and competence

All team members must undergo training in manual handling, hazardous material handling, and the use of relevant tools and equipment. Regular refresher courses should be provided to ensure continued competence. Specialized training may be required for handling specific hazardous materials or operating certain machinery.
10

Review and monitoring

The Project Manager and Site Supervisor will regularly review the clearance process to ensure adherence to this method statement. Health and Safety Officers will conduct periodic inspections to identify and address any safety concerns. Environmental impact assessments will be conducted to ensure compliance with regulations and company policies. Feedback will be collected from the clearance team and any issues will be addressed in future method statements. This method statement will be reviewed annually or after significant changes in procedures or regulations.